NEWS
Monday 18 September to Monday 30 October 2017 Clifton Reach, Clifton Lock Cut Bridge Repair works to Clifton Lock Cut Bridge: urgent repairs will reduce the available headway under the bridge from 4.06 metres to 3.12 metres.
2 January 2018 to 23 March 2018 Clifton Lock Re-sheeting lock gates